Cold-end corrosion experience in the steam turbine power plant

机译:汽轮机电厂的冷端腐蚀经验

获取原文

摘要

The Royal Commission for Jubaila nd Yanbu operates and maintains the power, desalination, and seawater cooling complex at Madinat Yanbu Al-Sinaiyah, Saudi Arabia. The complex includes a steam turine power plant consisting of three 130 MW units burning heavy fuel oil and/or ethane gas. The steam power plant has experienced corrosion in the hot-end elements of the air preheater, induced draft fans, expansion joints, and associated ducting downstream of the air preheater. This paper presents a study conducted to: (1) identify corrosion of the fire-side of the boiler component downstream of the economizer, (2) determine the causes of the corrosion, and (3) outline remedial measures adapted for the observed corrosion.
机译:朱拜伊拉·延布皇家委员会在沙特阿拉伯的Madinat Yanbu Al-Sinaiyah运营,维护着电力,海水淡化和海水冷却系统。该综合设施包括一个蒸汽制蒸汽发电厂,该发电厂由三个130 MW的机组组成,它们燃烧重质燃料油和/或乙烷气体。蒸汽发电厂在空气预热器的热端元件,引风机,膨胀节以及空气预热器下游的相关管道中受到腐蚀。本文提出了一项研究,以:(1)识别节煤器下游锅炉部件火侧的腐蚀,(2)确定腐蚀的原因,(3)概述适用于观察到的腐蚀的补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号