首页> 外文会议>American Water Works Association annual conference >Water plan expansion to meet curent needs at lookign to the future
【24h】

Water plan expansion to meet curent needs at lookign to the future

机译:扩大水计划以满足当前对未来的需求

获取原文

摘要

Facility plannign for expansion of a communities water system always raises the question,"Do we plan for our needs or do we assume we will grow? What is needed for the future? the Town of Queensbury,New York is going to be used as an example for the description of meeting current needs and lookign to hte future.Queensbury is a town located in Warren County,New York.The community is located on the upper Hudson river.The Town originally had a water supply which consisted of several small wells located throughout the Town.A wate rdistrict was formed in 1972 and final ocnstruction on their wate rtreatment plant was completed in 1975.The source of water for the treatment plant is the upper Hudson River.In 1990 the Town's water demand exceeded the water system's capacity.
机译:对社区供水系统进行扩展的设施规划总是提出这样一个问题:“我们是为我们的需求计划还是假设我们会增长?未来需要什么?纽约州昆斯伯里镇将被用作一个城市。描述满足当前需求和展望未来的示例。昆斯伯里(Queensbury)是位于纽约沃伦县的一个小镇,社区位于哈得逊河上游,该镇最初的供水是由几个小井组成的整个水镇.1972年成立了供水区,1975年完成了污水处理厂的最后建设工程。处理厂的水源是哈得逊河上游.1990年,该镇的需水量超过了供水系统的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号