首页> 外文会议>International conference centrifuge >Load transfer mechanism of piled raft foundation
【24h】

Load transfer mechanism of piled raft foundation

机译:桩筏基础的负载转移机制

获取原文

摘要

The paper reports the results of centrifuge tests on piled raft foundation models. The model raft consists of a circular rigid plate axially loaded on a soft layer of clay. The model piles, ideally bored beneath the raft foundation, are 6 mm indiameter; they are instrumented by means of loading cells especially designed, so the load acting on the pile head or on the pile tip was measured. A series of tests have been performed using a number of piles ranging from one to 19 beneath the plate.Moreover three models were tested: the rigid plate without pile, a single free standing instrumented pile and a solid block which simulated the upper limit of so many piles that the group acts as a block foundation. The paper describes the details ofexperiments undertaken, the adopted procedures and some of the gathered results.
机译:本文报告了堆积筏基础模型对离心机测试的结果。模型筏由轴向装载在粘土的软层上的圆形刚性板组成。型号桩,理想地厌倦了筏子基础下方,是6毫米的indiameter;它们通过尤其设计的装载单元来仪表,因此测量作用在桩头或桩尖上的负载。已经使用了一系列桩在板下方的一堆堆积中进行了一系列测试。经过三种型号,造成三种型号:没有桩的刚性板,单一自由常规仪表桩和模拟上限的固体块该组织作为块基础的许多桩。本文描述了对实验的细节,采用的程序和一些收集的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号