首页> 外文会议>International conference centrifuge >Some considerations for simulation of the Pubugou dam and cut off wall
【24h】

Some considerations for simulation of the Pubugou dam and cut off wall

机译:用于模拟湖汇坝和切断墙面的一些考虑因素

获取原文

摘要

The 186 meters high Pubugou dam is the largest earth fill dam under design in China. The safety of the 70 meters high cut off wall is one of the key problems in the dam's design. The centrifugal model tests were carried out to assess the safety of the cut off wall. In this paper some considerations of the simulation were introduced, including the test section determination, equivalent materials for prototype soils, the cut off wall simulations and the discussion of test results.
机译:186米高的牛奶大坝是中国设计中最大的地球填充水坝。截止墙的70米的安全是大坝设计中的关键问题之一。进行了离心模型测试,以评估切断墙的安全性。本文介绍了仿真的一些考虑因素,包括试验部分确定,原型土壤的等效材料,切断墙体模拟和试验结果的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号