首页> 外文会议>International symposium on offshore engineering >Approval analysis procedure for the mobile offshore base
【24h】

Approval analysis procedure for the mobile offshore base

机译:海上移动基地的批准分析程序

获取原文

摘要

Since early 1995, the American Bureau of Shipping has supported various elements of the Department of the Navy investigating the possibility of pre-positioning forces as well as large quantities of military equipment and supplies on Mobile Offshore Bases (MOB). A basic characteristic for these units is the ability to be moved as necessary to meet changing military and political conditions. Current thinking includes concepts such as a series of mobile offshore drilling unit (MODU)-like structures joined together to form a facility capable of handling air and sea cargo delivery and transfer.
机译:自1995年初以来,美国航运局一直支持海军部的各个部门,调查在海上可移动基地(MOB)上预部署部队以及大量军事装备和补给的可能性。这些部队的基本特征是能够根据需要移动以适应不断变化的军事和政治条件。当前的想法包括一些概念,例如一系列移动式海上钻井平台(MODU)式结构,这些结构结合在一起形成了能够处理空运和海运货物的运输和转移的设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号