CONSTRUCTION PROGRESS ON THE DC CLEAN RIVERS PROJECT

机译:DC Clean Rivers项目的施工进展

获取原文

摘要

On October 12, 2011, with federal, regional, and local officials present-and a headline banner running in lights across the display in Times Square-the US$2.6 billion DC Clean Rivers Project officially broke ground. Construction began on the 7,378 m (24,200 ft) long, 8 m (26.3 ft) diameter Blue Plains Tunnel. Within a year, construction began on a new overflow and diversion structure near RFK Stadium (Division C), a diversion tunnel system on M Street Southeast (Division E), a diversion tunnel beneath Interstate 695 at the 11th Street Bridge Project (Division G), and a diversion tunnel on Tingey Street (Division B). This paper discusses the status of DC Water's construction progress on the DC Clean Rivers Project.
机译:2011年10月12日,与联邦,地区和地方官员在时代广场展出的灯光上呈现 - 和标题横幅 - 美国国税局26亿美元的DC清洁河流项目正式破产。施工开始于7,378米(24,200英尺)长,8米(26.3英尺)直径的蓝色平原隧道。在一年之内,建设开始在RFK体育场(C)附近的新溢流和转移结构,是M街东南(e)的转移隧道系统,在第11街桥梁项目下的695年下方的转移隧道(Division G)和蒂蒂街(B师分区)的转移隧道。本文探讨了直流水直流清洁河流项目的施工进展的现状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号