首页> 外文会议>Rapid excavation and tunneling conference >MASSIVE ANNULAR GROUT AND LONG-DISTANCE PUMPING AT THE SEYMOUR-CAPILANO PROJECT
【24h】

MASSIVE ANNULAR GROUT AND LONG-DISTANCE PUMPING AT THE SEYMOUR-CAPILANO PROJECT

机译:Seymour-Capilano项目的巨大环形灌浆和长距离泵送

获取原文

摘要

The Seymour Capilano Twin Tunnels Project in North Vancouver, British Columbia has two water tunnels, each 7.2km * 3.8m in excavated diameter. The tunnels receive a steel lining at each end that is up to 1400 m long. The annular space between the lining and the tunnel rock is filled with a grout required to meet stringent strength, shrinkage and peak temperature requirements. The development of the special grout used for backfilling the liner, and the methods and equipment developed for placing the grout over the full 1400m lengths of liner in a continuous operation is described. The test method developed to ensure the grout met structural requirements for the liner, what those requirements are and how liner capacity is affected by grout properties is also described. The paper gives recommendations for the specification of backfill materials with a focus on fluid properties which are critical to a successful backfilling operation.
机译:英国哥伦比亚北温哥华的Seymour CapiLano双隧道项目有两个水隧道,每个水隧道挖掘直径7.2km * 3.8米。隧道在每个端接收钢衬,长达1400米长。衬里和隧道岩之间的环形空间充满了满足严格强度,收缩和峰值温度要求所需的灌浆。描述了用于回填衬垫的特殊灌浆的开发,以及用于将灌浆放置在连续操作中完整的1400m长度的衬里开发的方法和设备。开发的测试方法,以确保灌浆满足衬里的结构要求,这些要求是什么以及衬里容量如何受植物特性的影响。本文提出了对回填材料的规范,重点是对成功回填操作至关重要的流体性质的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号