LAKE MEAD INTAKE NO. 3 TUNNEL INTAKE STRUCTURE AND TREMIE CONCRETE PLACEMENT

机译:米德湖摄入没有。 3隧道进气结构和TREMIE混凝土展示

获取原文

摘要

The Lake Mead Intake No. 3 Tunnel and Shafts Project includes construction of a 183 m deep vertical access shaft, an approximately 4,8 km long, TBM-mined, 6.1 m inside diameter segmentally lined tunnel, and a composite concrete and stainless steel intake structure that is placed in 100 m depth of water at the bottom of Lake Mead. This paper discusses the operations related to the setting of the intake structure into the excavated shaft located in the bottom of the lake. The work consisted of placing a guiding frame into the excavated hole to seat the intake structure in the proper position, surveying of the intake location, and placement of tremie concrete around the submerged intake structure.
机译:墨扇湖摄入量3号隧道和轴工程包括建造183米深的垂直进入轴,大约4,8公里,连续6.1米内径衬砌隧道,以及复合混凝土和不锈钢摄入量在米德湖底部放置在100米水中的结构。本文讨论了与进气结构设置到位于湖底的挖掘轴上相关的操作。该工作包括将导向框架放入挖掘孔中,以便在适当的位置,测量进气位置,以及在浸没的进气结构周围进行Tremie混凝土的调查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号