首页> 外文会议>Rapid excavation and tunneling conference >INNOVATION IN ANNULAR GROUTING AT THE EUCLID CREEK TUNNEL, CLEVELAND, OHIO
【24h】

INNOVATION IN ANNULAR GROUTING AT THE EUCLID CREEK TUNNEL, CLEVELAND, OHIO

机译:俄亥俄州克利夫兰克利夫河隧道环形灌浆的创新

获取原文

摘要

Void grouting behind concrete segmental tunnel linings is a relatively straightforward task in conjunction with an Earth Pressure Balance or Slurry Tunnel Boring Machine in soft ground. However, there are times when a segmentai lining is called for in a rock tunnel, with or without the need for such a TBM. This paper focuses on the Euclid Creek Tunnel in Cleveland, Ohio, and explains: what drove the selection of this lining system; the challenges that exist when using this system in a rock tunnel with an open TBM; and how the challenges were dealt with during construction
机译:在混凝土节段隧道衬里背后的空隙灌浆是一个相对简单的任务,与软土地上的地球压力平衡或泥浆隧道镗床结合。然而,有时候在岩石隧道中呼叫Segingai衬里时,有或不需要这种TBM。本文重点介绍俄亥俄州克利夫兰的Euclid Creek隧道,并解释说:驱动了这种衬里系统的选择;在具有开放TBM的岩石隧道中使用该系统时存在的挑战;以及在建筑过程中如何处理挑战

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号