DELIVERING VALUE AND RISK MANAGEMENT THROUGH A COMPETITIVE ALLIANCE PROCUREMENT PROCESS

机译:通过竞争联盟采购过程提供价值和风险管理

获取原文

摘要

The selection of the Procurement method for major projects often has a significant outcome on the ultimate delivery of a project. The $1.2B Waterview Connection project is the largest and most complex project yet undertaken by the New Zealand Transport Agency and consideration was given to many contract forms. This paper describes the NZTA decision process in adopting the competitive alliance model, and more particularly measures taken during the procurement process to achieve certainty with respect to outcomes and minimize project risks whilst also achieving value for money. Refinements to the procurement process to ensure compliance with the Code of Practice for Risk Management of Tunnel Works prepared by the International Tunnel Insurance Group are described along with the other risk mitigation measures applied to achieve a successful procurement outcome. Also described is the alliance commercial model which serves to both facilitate collaboration between the Contracting consortia and Client to achieve "best for project" outcomes as well as managing commercial risks for all participants.
机译:为主要项目的采购方法的选择往往在项目的最终交付方面具有重要结果。 $ 1.2B WaterView连接项目是新西兰运输代理公司所承担的最大,最复杂的项目,并考虑到许多合同表格。本文介绍了采用竞争联盟模型的NZTA决策过程,以及在采购过程中采取的更多措施,以实现关于成果的确定性,并尽量减少项目风险,同时也实现了物有所值。采购过程的改进,以确保遵守国际隧道保险集团编制的隧道作品风险管理守则,以及适用于实现成功采购结果的其他风险缓解措施。还描述了联盟商业模式,旨在促进缔约国联盟和客户之间的合作,以实现“最佳项目”结果,以及管理所有参与者的商业风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号