TúNEL EMISOR ORIENTE IN MEXICO-THE WORLD’S MOST CHALLENGING EPB SHIELD TUNNELLING PROJECT

机译:TúnelEmisor Oriente在墨西哥 - 世界上最具挑战性的EPB盾构隧道工程

获取原文

摘要

This paper presents the main features and the tunnelling construction challenges of the 62 km Emisor Oriente sewage tunnel, north of Mexico City, one of Mexico’s outstanding strategical projects. Six EPB shields with boring diameters of 8.74 m and 8.93 m will excavate mostly soils with overburdens up to 135 m. The soils comprise very soft settlement prone clays of the Mexico Valley, deep consolidated clayey and sandy sediments with boulders with potential water pressures up to 7 bar. Some stretches will also be excavated in hard basalt rock. Apart from the challenges confronted in the design of the two-pass lining, these conditions represent an extension of the typical application ranges for EPB shields. Therefore, great effort will have to be directed to adequately adjust the operation process technologies, enhance the TBM monitoring and process controlling tools and perform additional measures, aiming to optimise key success factors such as the advance speed, the ground conditioning, the minization of tool wear and the muck transport and disposal.
机译:本文介绍了墨西哥北部62公里Emisor Oriente污水隧道的主要特点和隧道施工挑战,墨西哥北部的墨西哥杰出的战略项目之一。六个具有镗孔直径为8.74米和8.93米的EPB屏蔽将主要挖掘过剩135米的土壤。土壤包括墨西哥谷的非常软沉降易粘土,深综合的粘土和砂质沉积物,巨石,巨大的水压高达7巴。一些延伸也将在硬玄武岩岩石中挖掘出来。除了在设计双通衬里的设计中面临的挑战之外,这些条件代表了EPB屏蔽的典型​​应用范围的扩展。因此,必须采取巨大的努力来充分调整操作过程技术,增强TBM监控和过程控制工具,并执行额外的措施,旨在优化推进速度,地面调节,工具碎片等关键成功因素磨损和淤泥运输和处置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号