In 2008, the Cobb County Water System began construction of the South Cobb Tunnel, its second wastewater tunnel. The South Cobb Tunnel is an 8.9-km (5.5-mile) long, 8.2-m (27-ft) diameter, hard rock tunnel. At its maximum depth of 122 m (400 ft), it is the deepest tunnel constructed in the Atlanta area. This paper describes ground and groundwater conditions encountered along the tunnel alignment, excavation using the refurbished Herrenknecht S-288 tunnel boring machine (TBM), excavation and concrete lining of the 34.7-m (114-ft) diameter pump station shaft and two 13.4-m (44-ft) diameter construction shafts, and construction of six tangential vortex intake structures that transfer flow from interceptor sewers to the tunnel.
机译:2008年,科布县水系统开始建设南科布尔隧道,其第二废水隧道。南科巴隧道是8.9公里(5.5英里)的长8.2米(27英尺)的直径,硬岩隧道。在最大深度为122米(400英尺),是在亚特兰大地区构建的最深隧道。本文介绍了沿着隧道对准遇到的地面和地下水条件,采用翻新的Herrenknecht S-288隧道镗床(TBM),挖掘和混凝土衬里,34.7 - (114英尺)直径泵站轴和两个13.4 - M(44-FT)直径结构轴,并施加六个切向涡流的结构,将拦截器下水道传递到隧道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号