首页> 外文会议>Rapid excavation and tunneling conference >DESIGN CONSIDERATIONS FOR THE USE OF SLURRY WALLS AS PERMANENT WALLS FOR DEEP RECTANGULAR SHAFT STRUCTURES IN SEISMIC AREAS-SILICON VALLEY RAPID TRANSIT PROJECT
【24h】

DESIGN CONSIDERATIONS FOR THE USE OF SLURRY WALLS AS PERMANENT WALLS FOR DEEP RECTANGULAR SHAFT STRUCTURES IN SEISMIC AREAS-SILICON VALLEY RAPID TRANSIT PROJECT

机译:用于使用浆料墙作为永久壁的设计考虑因素地震区域 - 硅谷快速运输项目中的深矩形轴结构

获取原文

摘要

Slurry diaphragm walls are commonly used as both temporary excavation support walls, and permanent structural walls, for circular shafts and long rectangular structures (such as underground subway stations); however, they are not commonly used for more compact rectangular or square shafts. In these instances, a second wall is typically cast inside the slurry walls to form the permanent structure. This paper discusses the approach used on the Silicon Valley Rapid Transit Project in California to analyze these compact rectangular types of structures for static and seismic loading, and to determine whether or not slurry walls can be confidently used as both the temporary and permanent walls for two tunnel ventilation shafts.
机译:浆料隔膜墙通常用作临时挖掘支撑壁和永久性结构壁,用于圆轴和长矩形结构(如地下地铁站);然而,它们通常不用于更紧凑的矩形或方形轴。在这些情况下,第二壁通常在浆料壁内浇铸以形成永久结构。本文讨论了加利福尼亚硅谷快速运输项目的方法,分析了静态和地震荷载的这些紧凑矩形类型的结构,并确定是否可以自信地使用浆料壁作为两个的临时和永久墙壁隧道通风轴。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号