首页> 外文会议>Conference on probabilistic safety assessment and management >Risk-Based Improvement of Nuclear Power Plant Inservice Test and Inspection Programs
【24h】

Risk-Based Improvement of Nuclear Power Plant Inservice Test and Inspection Programs

机译:基于风险的核电站核电站测试和检查计划的改进

获取原文

摘要

Nuclear power plant inservice testing (IST) programs were developed to ensure the reliable operation of safety-related pumps and valves. Codes, standards, and guidelines for these test have been developed by the American Society of Mechanical Engineers (ASME) Operations and Maintenance Committee at the request of the U.S. Nuclear Regulatory Commission (NRC). The essential regulation governing this process of testing is 10CFR50.55, which has been implemented viaASME Section XI,both for passive component examination (welding, studs, etc.) and for active component testing (pumps and valves).
机译:开发了核电站核电站测试(IST)计划,以确保安全相关泵和阀门的可靠运行。这些测试的代码,标准和指导方针由美国机械工程师(ASME)运营和维护委员会的要求是由美国核监管委员会(NRC)的要求制定的。管理该测试过程的基本规则是10CFR50.55,其已经实施了ViaSME部分XI,用于被动组件检查(焊接,螺柱等)和有源组件测试(泵和阀门)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号