首页> 外文会议>Annual meeting of the American power conference >Maine yankee steam generator tube sleeving thermal-hydraulic and safety analysis impacts
【24h】

Maine yankee steam generator tube sleeving thermal-hydraulic and safety analysis impacts

机译:缅因州洋基蒸汽发生器套管对热工液压和安全分析的影响

获取原文

摘要

After experiencing a slow but steady increase in measured primary-to-secondary leakage during Cycle 14, Maine Yankee decided in July, 1994 to perofrm a mid-cycle shut down to identify the leaking steam generator tube. During the ensuing tube inspections, several tubes were identified as having indications of circumferential cracks, a few of which were approaching the Regulatory Guide 1.21 acceptance limits.
机译:在第14周期中,一次至二次泄漏的测量值出现缓慢但稳定的增长后,缅因州扬基于1994年7月决定进行一次中间周期停机,以识别出泄漏的蒸汽发生器管。在随后的试管检查中,发现有几支试管有圆周裂纹的迹象,其中有几支已接近《规范指南》 1.21的接受极限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号