Construction technology of underground engineering

机译:地下工程施工技术

获取原文

摘要

Guangzhou Putnped-storage Power Station(GPSPS) which has an installed capacity of 2400 MW is scheduled to be completed in two stages. All bids are won by our bureau. The first stage has an installed capacity of 1200 MW. Its first unit was in service on 23 March, 1993. All the four units of stage I, completed only by 49 months, were put into commercial operation by the end of 1994. The construction period of stage I is 54 months. The second stage, scheduled to be on line by the end of 1998, is being constructed smoothly. The entire project is rapidly constructed with high quality and low cost.
机译:装机容量为2400兆瓦的广州推杆式储能电站(GPSPS)计划分两个阶段完成。所有投标均由我局中标。第一阶段的装机容量为1200兆瓦。它的第一台机组于1993年3月23日投入使用。第一阶段的全部四个单元仅在49个月内完成,到1994年底才投入商业运行。第一阶段的建设期为54个月。第二阶段计划于1998年底上线,目前正在顺利进行中。整个项目以高质量和低成本迅速建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号