首页> 外文会议>International conference on hydropower;HP'96 >Analysis of sediment problem of Pushihe Pumped-Storage Power Plant
【24h】

Analysis of sediment problem of Pushihe Pumped-Storage Power Plant

机译:普什河抽水蓄能电站泥沙问题分析

获取原文

摘要

Through model study and calculation, the sediment deposition pattern and quantity in the lower reservoir and the influence of sand abrasion on water passing elements were grasped in general. In general, there exists some influence of sediment on Pushihe Power plant.Through reasonable project layout, flexible reservoir operation, reasonableselection of pump -turbine parameters and materials of water passing elements and alleviation measures, the long-term benefit and normal operation of the plant could be guaranteed.
机译:通过模型研究和计算,大致掌握了下水库的泥沙淤积规律和数量,以及沙粒磨蚀对水流要素的影响。普什河电厂总体上存在一定的泥沙影响。通过合理的工程布置,灵活的水库调度,合理 选择水泵水轮机参数和通水元件的材料及缓解措施,可以保证电厂的长期利益和正常运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号