首页> 外文会议>International conference on hydropower;HP'96 >Hydropower generation - Indian scenario
【24h】

Hydropower generation - Indian scenario

机译:水力发电-印度情景

获取原文

摘要

A beginning was made in the Hydropower Generation in India with the commissioning of a small unit of 130 KW in Sidrapong Power Station in the tea estates of Darjeeling way back in 1897, which is still in operation.HydropowerDevelopment was rather modest during pre-independence period. But after independence stress was laid for its accelerated development especially when planned growth of economy was envisaged tinder successive five year plans realising that availability of power was the Key input for economic development of the country to usher better standard of living for millions of people.
机译:印度的水力发电开始于1897年,当时在大吉岭茶园的Sidrapong电站调试了一个130 KW的小型机组,该机组仍在运行。 独立前的时期,水电发展相当温和。但是,在独立后,特别是在计划经济增长时,特别强调了加速发展的步伐,连续五年计划意识到电力供应是该国经济发展的关键投入,以为数以百万计的人民带来更好的生活水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号