首页> 外文会议>International conference on hydropower;HP'96 >Selection and application of 500kV oil-filled cable at Guangzhou Pumped Storage Power Station
【24h】

Selection and application of 500kV oil-filled cable at Guangzhou Pumped Storage Power Station

机译:广州抽水蓄能电站500kV充油电缆的选择与应用

获取原文

摘要

When a kind of equipment is operated in an extreme using condition or envirement, selectiondesign is an important step to be done.For the Guangzhou Pumped Storage Power Station, the 500,kV Cable system shall meet thefollowings technical requirement:First, the operation mode and the transmision capacity;Second, the power net-work's requirement;Third, the arrangement of the power station complex, and the natural evirement conditions.After selection, a strict testing program is neccesary to work out to verify the quality andperformance of the selected euipment.
机译:当一种设备在极端使用条件或环境下运行时,选择 设计是重要的一步。 对于广州抽水蓄能电站,其500,kV电缆系统应满足 以下技术要求: 一,运行方式和传输能力; 二,电网的要求; 第三,电站综合体的布置,以及自然环境条件。 选择后,必须制定严格的测试程序以验证质量并 所选设备的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号