首页> 外文会议>Annual meeting of the American power conference >Soot blower ocntrol system upgrade provides win/win opportunities
【24h】

Soot blower ocntrol system upgrade provides win/win opportunities

机译:吹灰机控制系统升级提供双赢的机会

获取原文

摘要

This paper discusses Diamond Power's BOS~direct R soot blower control systems installed and operating at Detroit Edison's Belle River Power Plant since early 1992. The plant now has the capability of multiple sequences that provide the soot-blowing flexibility to minimize thermal cycling and boiler tube erosion.The plant realized considerable cost savings in reducing wasted steam due to previously undetectable feed tube packing leaks and incorrectly adjusted blowing pressures. This joint effort by the utility and Diamond Power Specialty Company led to the development of aditional programs to closely monitor individual soot blower performance, reducing hideen costs caused by wasted steam and boiler tue erosion. COnsiderable cost savings for the utility and an enhanced control system product offering for the OEM were the major benefits of this initiative.
机译:本文讨论了自1992年初以来在底特律爱迪生公司的百丽河电厂安装并运行的Diamond Power的BOS〜direct R吹灰器控制系统。该工厂现在具有多重顺序的功能,可提供吹灰的灵活性,以最小化热循环和锅炉管。由于先前无法检测到的进料管填料泄漏和不正确调节的吹气压力,该工厂在减少浪费的蒸汽方面实现了可观的成本节省。公用事业公司和Diamond Power Specialty Company的共同努力导致制定了附加程序,以密切监视各个吹灰机的性能,从而减少了因浪费的蒸汽和锅炉烟囱侵蚀而造成的皮革成本。该计划的主要好处是为公用事业节省了可观的成本,并为OEM提供了增强的控制系统产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号