Electric utility planners, as part of the dynamic system planning process, are continually considering options and evaluating alternatives to installing new transmission lines and/or upgrading existing lines. The purposes are to increase reliability and maintain continuity of service to its customers at an optimum of cost, while meeting various regulatory and environmental requirements. Often utility system planners, with their system operators, will inspect and evaluate rebuilding and/or upgrading existing transmission lines, some that may be fully depreciated. The physical condition of the transmission facilities above ground may be determined through reviews of maintenance and outage records, as well as walking physical inspections. Determining the below ground condition of the transmission facilities is more difficult.
机译:作为动态系统规划过程的一部分,电力实用规划仪不断考虑选项和评估安装新传输线和/或升级现有行的替代方案。目的是以最佳成本提高可靠性并保持服务的连续性,同时满足各种监管和环境要求。常用系统规划师与其系统运营商将检查和评估重建和/或升级现有传输线,有些可能完全折旧。地面上方的传输设施的物理状况可以通过维护和中断记录以及步行物理检查来确定。确定传输设施的以下地面状况更加困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号