首页> 外文会议>International conference on environmental systems >Lunar Reconnaissance Orbiter (LRO) Thermal On-Orbit Performance
【24h】

Lunar Reconnaissance Orbiter (LRO) Thermal On-Orbit Performance

机译:月球侦察轨道器(LRO)的热在轨性能

获取原文

摘要

The Lunar Reconnaissance Orbiter (LRO) was launched on June 18, 2009. The nominal mission ended on September IS, 2010 and LRO is now on a four-year extended mission. The LRO performances in hot and cold cases are compared to pre-launch analysis predicts, and operational lessons learned are discussed. One instrument has required tighter-than-anticipated thermal control, and two others have frequently requested unanticipated calibration maneuvers that had to be evaluated for their thermal performance. A series of off nadir thermal analyses of the entire orbiter were performed prior to launch, and these predictions are compared to actual maneuvers, with a discussion of the process by which maneuvers can be rapidly evaluated for thermal concerns. On December 21", 2010, LRO experienced its first severe Lunar Eclipse. Operationally, this required the Spacecraft to pre-heat its main avionics panel in order to minimize control heater power during the period when the Earth blocks the sun from the moon. The operational design and in-flight performance are summarized.
机译:月球侦察轨道飞行器(LRO)于2009年6月18日发射升空。名义飞行任务于2010年9月IS结束,LRO现在进行了为期四年的延长飞行任务。将冷热情况下的LRO性能与发布前的分析预测进行比较,并讨论所获得的操作经验。一种仪器要求比预期严格的热控制,另外两种仪器经常要求进行未经预期的校准操作,必须对其热性能进行评估。在发射之前对整个轨道器进行了一系列离天底热分析,并将这些预测与实际机动进行了比较,并讨论了可以快速评估机动引起的热问题的过程。在2010年12月21日之前,LRO经历了第一次严重的月蚀。在操作上,这要求航天器预热其主要的航空电子面板,以便在地球挡住月球太阳的期间最大程度地降低控制加热器的功率。总结了运营设计和飞行中的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号