首页> 外文会议>International conference on environmental systems >Node 3 TCS Analysis and Test for Flight Preparation
【24h】

Node 3 TCS Analysis and Test for Flight Preparation

机译:节点3 TCS分析和飞行准备测试

获取原文

摘要

TAS-I has completed the Node 3 assembly & integration in Turin on May 2009 after PAR completion. Subsequently, Node 3 was charged inside Beluga and transported to KSC where the Italian technicians (in collaboration with NASA/ESA/Boeing) have conducted and completed the remaining tasks within the 18th November 2009 at KSC according to 20 A Flight (N3 plus Cupola) scheduled February 8th, 2010 as it was confirmed by the STS-130 FRR on January 27th (Launch for shuttle Endeavour's STS-130 mission was scheduled at 4:14 a.m. EST). This paper will summary thermal control system tasks being conducted and developed for the 20A flight related to both Node 3 and Cupola mated to N3 axial CBM.
机译:TAS-I在PAR完成后于2009年5月在都灵完成了Node 3组装和集成。随后,节点3在白鲸内部被指控,并被运送到KSC,意大利技术人员(与NASA / ESA /波音公司合作)根据20 A航班(N3加冲天炉)在2009年11月18日在KSC进行并完成了其余任务。计划于2010年2月8日获得STS-130 FRR的确认(1月27日,奋进号航天飞机的STS-130航天飞机发射任务预定于美国东部时间上午4:14进行)。本文将总结正在为20A飞行进行和开发的,与节点3和与N3轴向煤层气配套的冲天炉有关的热控制系统任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号