首页> 外文会议>Deep Foundations Institute annual conference >DESIGN OF AN UNBRACED ELLIPTICAL SLURRY WALL COFFERDAM FOR DEEP PUMP STATION CONSTRUCTION
【24h】

DESIGN OF AN UNBRACED ELLIPTICAL SLURRY WALL COFFERDAM FOR DEEP PUMP STATION CONSTRUCTION

机译:深水泵站无拱椭圆形淤泥墙的设计。

获取原文

摘要

An elliptical cofferdam has been developed as a support of excavation system for a proposed underground pump station. The station is about 46 ft. wide, 63 ft. long and 62 ft. deep. The Support of Excavation (SOE) system for the station construction has to meet a few criteria. The limit of SOE should be within the station property and also interference to other adjacent foundation structures is to be minimal. Also the SOE system has to be cost effective.
机译:已经开发了椭圆围堰作为拟议的地下泵站开挖系统的支撑。站长约46英尺,长63英尺,深62英尺。车站建设的开挖支持(SOE)系统必须满足一些标准。 SOE的限制应在车站属性之内,并且对其他相邻地基结构的干扰也应最小。 SOE系统也必须具有成本效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号