首页> 外文会议>Deep Foundations Institute annual conference >CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA
【24h】

CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA

机译:利用加利福尼亚州圣何安三角洲的CUTTER SOIL MIX(CSM)方法构造两个微隧道通行井

获取原文

摘要

The Contra Costa Water District (CCWD) Alternative Intake Project - Victoria Canal Conveyance Pipeline is located within the San Joaquin Delta region of California, west of Stockton and east of Discovery Bay. The project included an approximately 275 m (900 ft) long tunneled segment that crosses the Old River between Byron Tract and Victoria Island. The contract documents specified that the river crossing be made by microtunneling from a jacking shaft on Byron Tract to a receiving shaft on Victoria Island. As is common in the Delta region of California, the river is confined by levees and the river level is significantly higher than the typical elevation of the land to either side of the river.
机译:反向哥斯达黎加水域(CCWD)替代取水项目-维多利亚运河输送管道位于加利福尼亚州的圣华金河三角洲地区,斯托克顿以西和愉景湾以东。该项目包括一条长约275 m(900 ft)的隧道段,该段跨过Byron Tract和Victoria Island之间的旧河。合同文件规定,河道穿越是通过微隧道从Byron Tract的顶井到维多利亚岛的接收井进行的。正如在加利福尼亚三角洲地区常见的那样,河流受堤坝限制,河流水位明显高于河流两岸的典型土地海拔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号