Interstate 40 Emergency Rock Remediation, Haywood County, North Carolina

机译:北卡罗来纳州海伍德县40号州际公路紧急岩石修复

获取原文

摘要

On Saturday morning, October 25, 2009 at 02:30 a massive rockslide occurred on Interstate 40 in North Carolina at Mile Marker 2.6 near the border with Tennessee. The volume of material that fell was roughly 80,000 cubic yards and some of the rock blocks were the size of city busses. Phillips and Jordan of Knoxville Tennessee were called under an emergency contract to remove slide material from the roadway and find a specialty subcontractor to address remediation of the remaining rock slope. Noel Philippon of Janod Contractors arrived on site Monday October 26th to assess the slope condition and develop a work plan with Phillips and Jordan, and Janod commenced initial scaling of the slide mass and scarp on October 28th. Initial scaling and material removal operations were closely monitored for movement as the slide was considered potentially still active. Jody Khune, a geological engineer with North Carolina Department of Transportation (NCDOT), completed geologic mapping of the slide mass and scarp and concluded that the slope consisted of several potential wedge failures and further rockfalls could be expected from the failure plane. An initial plan was developed to remove the slide debris and the remaining wedge structure extending up to 900 feet above the roadway where the joint planes daylighted. When wedge removal proved to be too expensive, NCDOT short listed contractors to bid on installing 50,000 linear feet of post-tensioned rock anchors up to 130 feet long in 60 days to stabilize the wedge structure. The team of Phillips and Jordan and Janod were the successful bidders on the project and the contract work started on December 28, 2009. There were several challenges on the project that became exponentially more complicated due to the fact that the work was to be performed during the worst weather of the year for that area and in one of the most severe winters in the last 30 years. Due to the time restraints in designing such a complicated project there were several changes to the design that were proposed by Janod. We discuss in detail the design and construction challenges that were met and innovative construction methods used that exceeded expectations.
机译:2009年10月25日星期六上午02:30,北卡罗来纳州40号州际公路在田纳西州边界附近的Mile Marker 2.6发生了巨大的石块滑坡。掉落的物料量大约为80,000立方码,其中一些岩石块是城市公交车的大小。田纳西州诺克斯维尔市的菲利普斯(Phillips)和乔丹(Jordan)根据一项紧急合同被召集,从行车道上清除滑石,并找到一家专业分包商来对剩余的岩石边坡进行整治。 Janod Contractors的Noel Philippon于10月26日星期一抵达现场,评估斜坡条件并与Phillips和Jordan共同制定工作计划,Janod于10月28日开始对滑块和陡坡进行初步定标。由于滑块被认为可能仍处于活动状态,因此最初的缩放和材料清除操作都受到了严密的运动监控。北卡罗来纳州交通运输部(NCDOT)的地质工程师Jody Khune完成了对滑坡体和陡坡的地质测绘,并得出结论,该斜坡包括若干潜在的楔形破坏,并且可能会从破坏平面上进一步坠落。制定了初步计划,以清除滑道碎屑和剩余的楔形结构,该结构在联合平面采光的巷道上方延伸至900英尺。当楔块拆除被证明过于昂贵时,NCDOT短名单承包商要求在60天之内安装50,000线性英尺的后张紧岩石锚,最长可达130英尺,以稳定楔形结构。菲利普斯(Phillips)和约旦(Jordan)和贾诺(Janod)团队是该项目的成功竞标者,合同工作于2009年12月28日开始。由于该项目要在2009年12月28日进行,因此该项目面临着数个复杂的挑战,并且呈指数级增长该地区是一年中最恶劣的天气,也是过去30年来最严峻的冬季之一。由于设计这样一个复杂项目的时间有限,Janod提出了一些设计变更。我们将详细讨论所遇到的设计和施工挑战以及所使用的创新施工方法超出了预期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号