首页> 外文会议>International conference on structural mechanics in reactor technology;SMiRT 19 >Optimal integration of Maintenance Programs with other safety related programs in a Plant Life Management framework
【24h】

Optimal integration of Maintenance Programs with other safety related programs in a Plant Life Management framework

机译:在工厂生命管理框架中将维护计划与其他与安全相关的计划进行最佳集成

获取原文

摘要

Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLIM (Plant Life Management) of their older nuclear facilities. PLIM/PLEX (Plant Life Extension) has already been implemented in many countries (USA, Russia,etc). This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions.The review of regular maintenance and ageing management programs is widely used in LTO/PLIM context in many Countries. However, most of these programmes are rather general and in many cases they need reshaping in an LTO/PLIM framework before application, with focus to the safety implications of the LTO/PLIM. Many Countries and plants radically modified their maintenance rules towards a condition based approach as a precondition for the implementation of LTO/PLIM programs.Moreover, a PLIM framework requires both a detailed review of the features of the main safety programs (Maintenance, ISI, Surveillance) and a complete integration of these programs into the general management system of the plant. New external factors, such as: large use of subcontractors, need for efficient management of spare parts, request for heavy plant refurbishment programs demand for updated techniques in the overall management of the plant. Therefore new organisational models have to be developed to appropriately support the PLIM framework, integrating both safety related and non safety related issues.In 2004 a network of European Organisations operating Nuclear Power Plants, SENUF, under the coordination of the JRC-IE, carried out an extensive questionnaire on maintenance practice in their facilities aiming at capturing the aspects of the maintenance programs where research is mostly needed. This paper uses some results of the questionnaire, which was not oriented to LTO/PLIM, to draw some conclusions on how the current maintenance programs could support a potential LTO/PLIM, among the other programs running at NPPs. A joint IAEA-JRC workshop in 2006 confirmed the conclusions of the questionnaire and added new issues to the picture.The paper aims at identifying the technical attributes of the maintenance programs more directly affecting the decision for a long-term safe operation of a nuclear facility, the issues related to their implementation and the most suitable organisational framework for a proper implementation.
机译:由于当前的社会和经济框架,在过去的几年中,许多核电厂所有者启动了其较早的核设施的长期运行(LTO)/ PLIM(工厂生命管理)计划。 PLIM / PLEX(植物寿命延长)已在许多国家(美国,俄罗斯等)实施。除了战略和政治方面的影响外,这一过程还涉及许多核安全问题。近年来,迫切需要针对此类应用定制可用的安全评估工具,并引发了许多研究行动。 在许多国家的LTO / PLIM背景下,对定期维护和老化管理计划的审查已被广泛使用。但是,这些程序大多数都相当笼统,在许多情况下,它们在应用之前需要在LTO / PLIM框架中进行重塑,重点是LTO / PLIM的安全性。许多国家和工厂从根本上将维护规则修改为基于条件的方法,以作为实施LTO / PLIM计划的前提。 此外,PLIM框架既需要详细审查主要安全程序(维护,ISI,监视)的功能,又需要将这些程序完全集成到工厂的一般管理系统中。新的外部因素,例如:分包商的大量使用,对备件的有效管理的需求,重型工厂整修计划的要求,对工厂整体管理中更新技术的需求。因此,必须开发新的组织模型来适当地支持PLIM框架,同时整合安全相关和非安全相关的问题。 2004年,在JRC-IE的协调下,运行核电厂的欧洲组织SENUF网络在其设施中进行了有关维护实践的广泛调查表,旨在捕获最需要研究的维护计划的各个方面。本文使用了问卷调查的一些结果,这些结果并非针对LTO / PLIM,而是就目前的维护计划如何支持潜在的LTO / PLIM以及在NPP上运行的其他计划得出了一些结论。原子能机构-JRC于2006年举行的联合讲习班证实了调查表的结论,并在图片中增加了新的问题。 本文旨在确定维护计划的技术属性,这些属性会更直接地影响到核设施长期安全运行的决定,与实施计划有关的问题以及最适当的组织框架,以适当地实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号