首页> 外文会议>International conference on structural mechanics in reactor technology;SMiRT 19 >Feasibility Study on Base Mat Uplift of Nuclear Power Plants Using Large-Scale Blast Excitations (Part 2: Preliminary Uplift Test of Block Specimen)
【24h】

Feasibility Study on Base Mat Uplift of Nuclear Power Plants Using Large-Scale Blast Excitations (Part 2: Preliminary Uplift Test of Block Specimen)

机译:大规模爆炸激发下核电站基垫隆起的可行性研究(第2部分:块状试样的初步隆起试验)

获取原文

摘要

It is important to estimate the base mat uplift for the design of nuclear power plants against severe earthquakes in Japan. JNES (Japan Nuclear Energy Safety Organization) performs a test project focused on the base mat uplift behavior using blast-induced ground motions at a mining site. The investigation of the blast-induced ground motion is reported in part 1[1]in SMiRT-19.In part 1, we selected Black Thunder Mine (BTM) in the U.S.A. as a test site and measured the blast-induced ground motion. As a result it was conformed that the blast-induced ground motions at BTM are enough acceleration level for the base mat uplift test and the observed motions have similar characteristics to the earthquakes.Before the main tests, a preliminary test was executed at the test site in order to confirm that the method to measure the base mat uplift was working fine.
机译:评估日本针对严重地震的核电站设计的基垫隆起非常重要。日本核能安全组织(JNES)(日本核能安全组织)执行了一个测试项目,重点是在矿场使用爆炸引起的地面运动来提高基垫的举升性能。 SMiRT-19的第1部分[1]报告了爆炸引起的地面运动的研究。 在第1部分中,我们选择了美国的Black Thunder Mine(BTM)作为测试地点,并测量了爆炸引起的地面运动。结果表明,爆炸引起的地震动在BTM上足以加速基础垫层的抬升试验,并且观测到的震动具有与地震相似的特征。 在进行主要测试之前,要在测试现场进行初步测试,以确认测量底垫隆起的方法是否正常。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号