首页> 外文会议>中国第一届国际疏浚技术发展会议及展览会 >The Construction and Maintenance of The Deep-Waterway in Yangtze Estuary
【24h】

The Construction and Maintenance of The Deep-Waterway in Yangtze Estuary

机译:长江口深水航道的建设与维护

获取原文

摘要

The first stage regulated project of deep-waterway in Yangtze Estuary is through building regulation structures to stabilize the inflow current and me flow field, and make the ebb tide's main current accord with the channel's axis in North Passage. Based on such result, we have succeeded in the construction and maintenance of the 8.5m deep waterway. Thanks to the exact management, we have got every unit's construction details, and after analysis, we have also got some imponant rules of channel's back silting. And in the waterway's maintenance management and the navigable depth's enactment, we also proceed persistently.
机译:长江口深水航道的第一阶段调节工程是通过建立调节结构来稳定入流和水流场,并使退潮的主水流与北通道的河道轴线一致。基于这样的结果,我们成功地完成了8.5m深水道的建设和维护。得益于精确的管理,我们获得了每个机组的施工细节,经过分析,我们还获得了一些重要的渠道回淤规则。在航道的维护管理和通航深度的制定中,我们也坚持不懈地进行着。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号