【24h】

Cleanup of buried depleted uranium from trench 1 at rocky flats

机译:清理岩滩上沟槽1中的埋藏贫化铀

获取原文

摘要

The accelerated action to remove the depleted uranium chips and associated soils and wastes was conducted in the summer of 1998 at the Rocky Flats Environmental Technology Site at Trench 1. Extensive and rigorous planning, which included following the principles of the Integrated Safety Management System and enhanced work planning, was carried out to ensure that the remedial action was conducted safely. This approached relied predominantly on the involvement of workers, technical support groups and the project staff. Feedback throughout he project and incorporation of lessons learned were also essential in resolving issues in an effective and efficient manner. Because of the high levels of volatile organic compounds and polychorinated byphenyls found in the drums of depleted uranium wastes, the material could not be shipped to the treatment subcontractor for recycling as originally planned.
机译:1998年夏天,在Trench 1的Rocky Flats环境技术站点采取了加速行动,以消除贫化的铀屑以及相关的土壤和废物。进行了广泛而严格的规划,其中包括遵循综合安全管理体系的原则并加强了规划。进行了工作计划,以确保补救措施得到安全实施。这种方法主要依靠工人,技术支持小组和项目人员的参与。在整个项目中的反馈以及汲取的经验教训对于以有效和高效的方式解决问题也至关重要。由于在贫化铀废料桶中发现了高含量的挥发性有机化合物和多氯联苯,因此该材料无法按原计划运至处理分包商进行回收。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号