首页> 外文会议>Symposium on field instrumentation for soil and rock >The Key Role of Monitoring in Controlling the Construction of the New Jubilee Line between Waterloo and Westminster, London
【24h】

The Key Role of Monitoring in Controlling the Construction of the New Jubilee Line between Waterloo and Westminster, London

机译:监测在控制Waterloo和Westminster,伦敦新禧线建设中的关键作用

获取原文

摘要

Crucial to the success of Contract 102 of the Jubilee Line Extension Project (JLEP) was the detailed analysis of the impact of the construction process on the surrounding ground, structures and tunnels under construction. The construction works were to pass under or alongisde some of London's most historic and prestigious buildings, consequently stringent limits were imposed upon ground and structure movements. To control these movements and remain within the limits set, a comprehensive monitoring system was required, comprising a wide variety of instruments linked to a geotechnical database. An extensive and integrated instrumentation system was designed to produce quality data and as no monitoring system existed that covered the unique requirements of the contract and of the Balfour Beatty Amec Joint Venture (BBA), the option was taken by BBA to design and develop a system in house.
机译:Jubilee线扩展项目(JLEP)合同102的成功至关重要(JLEP)是对施工过程对施工周围地面,结构和隧道的影响的详细分析。建筑工程在伦敦的一些历史和着名建筑之下或携带伦敦最历史和盛名的建筑物之下,因此对地面和结构运动施加了严格的限制。为了控制这些动作并留在限制范围内,需要一个全面的监控系统,包括链接到岩土管理数据库的各种仪器。广泛且集成的仪表系统旨在生产质量数据,并且没有存在监控系统,这些系统涵盖了合同和Balfour Beatty AMEC合资(BBA)的独特要求,该选项由BBA设计和开发系统在房子里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号