首页> 外文会议>Conference on Winter simulation >A simulation study of basic oxygen furnace operations
【24h】

A simulation study of basic oxygen furnace operations

机译:基本氧气炉操作的模拟研究

获取原文

摘要

The study was conducted in the Basic Oxygen Furnace shop of a reputed steel company. Data were collected over extended periods to establish the statistical characteristics of daily liquid iron {hot metal) production from the blast furnaces, the life of refractory-lined vessels of the Basic Oxygen Furnace, and the heat-cycle time. This simulation generates total daily hot metal production from the specified distribution and determines the optimum combination of hot-metal-only charge (regular heat) and mixed charge (scrap and hot-metal or pre-heat) that will maximize ingot steel production within a fixed time period. The simulation takes into account the heat-cycle-time, the charge-mix, the number of heating-vessels available on the oxygen furnace, and the time required for relining of vessels. An iterative process using a modified form of the simplex algorithm with two constraints have been utilized in the simulation study for maximizing output. The output includes, on a daily basis, the hot-metal produced in tons, the number of vessels available, the number of regular-heats and pre-heats required for maximum steel production, steel production in tons, the amount to be pigged, and the amount available for the next day. The simulation provides the decision-maker in charge of the BOF operation with an operational discipline to maximize productivity and a reliable indicator to justify installation of scrap preheating facilities.

The entire simulation is written in Fortran IV, level G, and executed on an IBM 360 Model 65 computer.

机译:

该研究是在一家知名钢铁公司的基本氧气炉车间进行的。长期收集数据,以建立高炉每日生产铁水(铁水)的统计特征,碱性氧气炉的耐火衬里容器的寿命以及热循环时间。该模拟根据指定的分布生成每日总的铁水产量,并确定仅含铁水的装料(常规热量)和混合装料(废钢和铁水或预热)的最佳组合,这将最大限度地提高钢锭的产量。固定时间段。该模拟考虑了热循环时间,进料混合,氧气炉上可用的加热容器的数量以及更换容器所需的时间。在仿真研究中,使用了具有两个约束的单纯形算法修改形式的迭代过程,以使输出最大化。每天的产量包括以吨为单位生产的铁水,可用船的数量,最大钢产量所需的常规热和预热的数量,以吨为单位的钢产量,清管量,以及第二天的可用金额。该模拟为负责BOF运营的决策者提供了操作规程,以最大程度地提高生产率,并提供可靠的指标来证明废料预热设施的安装合理性。

整个仿真是用Fortran IV G级编写的,并在IBM 360 Model 65计算机上执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号