首页> 外文会议> >On Scheduling Model and Algorithm of Production Units of Refinery
【24h】

On Scheduling Model and Algorithm of Production Units of Refinery

机译:炼油企业生产单元调度模型与算法

获取原文

摘要

The production unit scheduling problem is very difficult since complex structures among production units. To get the minimum of total process cost of units, satisfy the main constraints and consider running and storage of units, take the blending components 1 for production targets of units, the production unit scheduling model is developed. A heuristic-based mathematical programming algorithm is introduced to obtain the optimum solution of such model to arrange production reasonably. The results of an example illustrate that it is effective.
机译:由于生产单元之间的结构复杂,因此生产单元调度问题非常困难。为了使单元的总过程成本最小,满足主要约束条件并考虑单元的运行和存储,以混合组件1为单元的生产目标,开发了生产单元调度模型。引入了一种基于启发式的数学规划算法,以获得该模型的最优解,以合理安排生产。一个例子的结果说明它是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号