首页> 外文会议> >Minimizing weighted flowtime in a two-stage flow shop with fuzzy setup and processing times
【24h】

Minimizing weighted flowtime in a two-stage flow shop with fuzzy setup and processing times

机译:通过模糊的设置和处理时间,在两阶段流水车间中最小化加权流水时间

获取原文

摘要

In this paper, we present a mixed integer fuzzy programming approach to scheduling of customer orders for various furniture styles. Jobs are grouped into multiple classes based on different factors such as fabric type, furniture style and order due dates to reduce number of setups. The family of jobs at each stage of operation can also be partitioned into batches, where each batch consists a set of consecutively processed jobs from the same class. If a batch is assigned to one of available parallel machines, a setup is required at the beginning of the first job in that batch. A schedule defines how batches are formed at each stage and specifies the processing order of the batches and that of the jobs within the batches. A machine can only process one job at a time, and cannot perform any processing while undergoing a setup. The proposed formulation minimizes the total weighted flow time while fulfilling due date requirements. Numerical experimentation reveals that the proposed solution approach can efficiently schedule up to 16 jobs
机译:在本文中,我们提出了一种混合整数模糊规划方法来调度各种家具风格的客户订单。根据不同的因素(例如织物类型,家具样式和订购截止日期)将作业分为多个类别,以减少设置次数。每个操作阶段的作业家族也可以分为多个批次,其中每个批次都包含一组来自同一类别的连续处理的作业。如果将批次分配给一个可用的并行计算机,则在该批次的第一个作业开始时需要进行设置。计划表定义了每个阶段如何形成批处理,并指定了批处理的顺序以及批内作业的处理顺序。机器一次只能处理一个作业,而在进行设置时不能执行任何处理。拟议的配方可最大限度地减少总加权流动时间,同时满足到期日要求。数值实验表明,所提出的解决方案可以有效地调度多达16个工作

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号