首页> 外文会议> >Progress report on the investigations into the recycling of existing HVAC power transmission circuits for higher power transfers using HVDC technology
【24h】

Progress report on the investigations into the recycling of existing HVAC power transmission circuits for higher power transfers using HVDC technology

机译:关于使用HVDC技术回收现有HVAC输电线路以进行更高功率传输的调查的进度报告

获取原文

摘要

Cost effective higher current rated power electronic technology makes possible the economic conversion of an existing HVAC transmission circuit for HVDC employment. The objective is to use an existing transmission line and to operate the installed conductors to its full rated current carrying capacity. The paper reports on the boundary conditions for the proposal to upgrade HVAC to HVDC and the technical implications of introducing HVDC onto an existing HVAC tower and line configuration. In conclusion, a possible application of the proposal is presented. Here an existing 3600 MW thermal power station is being prepared for an additional 2100 MW of generation. System planning promotes additional 400 kV or 765 kV HVAC transmission or to upgrade an existing 400 kV line for 500 kV DC application to yield a 3 GW power transfer capability.
机译:具有成本效益的更高额定电流的电力电子技术,使得可以将现有的HVAC传输电路经济地用于HVDC。目的是使用现有的传输线,并使已安装的导体运行到其最大额定载流量。本文报告了将HVAC升级到HVDC的建议的边界条件,以及将HVDC引入现有HVAC塔和线路配置的技术含义。总之,提出了该提案的可能应用。在这里,正在准备一个现有的3600 MW火力发电厂,以增加2100 MW的发电量。系统规划可促进额外的400 kV或765 kV HVAC传输,或升级现有的400 kV线路以用于500 kV直流应用,以产生3 GW的电力传输能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号