Since 1989 the first 500 kV line established, EGAT (Electricity Generation Authority of Thailand) has constructed a number of 500 kV lines. Therefore study related to the overvoltages is necessary to ensure safe operation. This paper presents the study results related to the Ferranti and energization overvoltages that could be effected by some factors. In EGAT 500 kV lines normally the shunt reactors are adopted at the line's two terminals. Meanwhile the surge arresters have also been installed at line's two terminals in parallel with the shunt reactors. The reclosing resistor of a circuit breaker is also attached in some cases. Ferranti overvoltages and energization overvoltage are the most common overvoltages in the EHV systems. As these components can have an effect on the values of overvoltages, the study of the effect of these components, shunt reactor, surge arrester, reclosing resistor, on the Ferranti and energization overvoltages should be carried out before the particular line to be commissioned. This study has been carried out by the simulation calculation using EMTP. Two EMTP versions (MicroTrain and ATP) have been used to check the calculation results.
机译:自1989年以来,第一个500 kV线建立,泰国的电力(泰国发电权威)建造了500千伏的线条。因此,需要研究与过电压有关,以确保安全运行。本文介绍了与菲兰提和通电过电压有关的研究结果,这些结果可能会受到一些因素的影响。在EGAT 500kV线中,通常在线的两个端子采用分流反应器。与此同时,浪涌避雷器也已经在线的两个端子与分流抗反液器并联安装。在某些情况下,断路器的闭合电阻也连接。 Ferranti过电压和通电过电压是EHV系统中最常见的过电压。由于这些组件可以对过电压的值产生影响,因此在特定线之前执行这些部件,分流响应器,电涌避雷器,折衷电阻,折叠电阻,电阻器的效果的研究应在特定线路委托之前进行。本研究通过使用EMTP进行了模拟计算进行了。两个EMTP版本(Microtrain和ATP)已被用于检查计算结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号