Managing schedule and financial risk: lessons learned on X2000

机译:管理进度和财务风险:在X2000上获得的经验教训

获取原文

摘要

The X2000 Program is a technology development program that will provide next generation avionics for missions to deep space. The goal of the X2000 Program is to develop revolutionary flight and ground systems which can be replicated by missions at a low cost, affording timely new science and mission opportunities to investigators and institutions. With the implementation of shorter development phases for projects, the need for better metrics to track a project's status became necessary. This paper describes different methods for tracking such performance. Schedule performance is discussed using event-driven performance assessment metrics, receivables/deliverables, slack tables, etc. Financial performance is addressed by discussion of earned value (cost variance/schedule variance), cash flow, reserves management, risk reduction funds, etc. Although X2000 IFDP is not a flight project, it is delivering hardware to other projects and is being managed as if it were a flight project.
机译:X2000计划是一项技术开发计划,将为执行深空飞行任务提供下一代航空电子设备。 X2000计划的目标是开发革命性的飞行和地面系统,这些系统可以低成本地由特派团复制,从而为调查人员和机构提供及时的新科学和特派团机会。随着项目的较短开发阶段的实施,有必要提供更好的指标来跟踪项目的状态。本文介绍了跟踪这种性能的不同方法。使用事件驱动的绩效评估指标,应收账款/可交付成果,备用表等来讨论进度绩效。财务绩效是通过讨论挣值(成本差异/进度差异),现金流量,储备管理,降低风险的资金等来解决的。尽管X2000 IFDP不是飞行项目,但它正在为其他项目提供硬件,并且像飞行项目一样受到管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号