Maintenance practices and Year 2000 preparations at the Virginia Smith Converter Station

机译:弗吉尼亚史密斯换流站的维护实践和2000年的准备工作

获取原文

摘要

The 200 MW back-to-back Virginia Smith Converter Station (VSCS) provides an asynchronous tie between the East and West AC power networks of the United States of America. Since being made available for commercial operation in March of 1987, a number of operational and maintenance issues have arisen prompting the need for preventive maintenance plans and procedures. This paper presents operating and maintenance experiences and preventive maintenance procedures adopted to ensure reliable operation of the station. Also discussed are Year 2000 (Y2K) concerns and testing.
机译:200 MW背靠背的弗吉尼亚史密斯换流站(VSCS)在美利坚合众国的东西方交流电网之间提供了异步连接。自1987年3月投入商业运营以来,出现了许多运营和维护问题,促使人们需要预防性维护计划和程序。本文介绍了操作和维护经验以及为确保站的可靠运行而采取的预防性维护程序。还讨论了2000年(Y2K)问题和测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号