Transformer overvoltage problems and countermeasures at black start

机译:黑启动时变压器过电压的问题及对策

获取原文

摘要

A system of Kyushu Electric Power Company Inc. or KEPCO (about 19 GW) belongs to the western Japan system (110 GW) and has a 500-kV and 220-kV transmission line in a loop configuration. Japan's power system has high reliability and experienced no blackout for the past several decades. However, there is a possibility, though very slight, of a blackout in the event of a big earthquake or unforeseen accident. Considering the risk of blackout, KEPCO has been conducting studies on system restoration. This paper discusses a mechanism of an overvoltage phenomenon during a restoration period in which, about 0.2 seconds or more after a transformer is energized, a voltage becomes maximum in excess of 200% of the rated voltage. The paper also discusses countermeasures against this phenomenon.
机译:九州电力公司或KEPCO的系统(约19 GW)属于日本西部系统(110 GW),并具有5​​00 kV和220 kV的环状输电线路。日本的电力系统具有很高的可靠性,并且在过去的几十年中没有出现断电的情况。但是,如果发生大地震或意外事故,则有可能会停电,尽管可能性很小。考虑到停电的风险,KEPCO一直在进行系统恢复的研究。本文讨论了在恢复期间过电压现象的机理,在恢复期间,变压器通电后约0.2秒或更长时间,最大电压超过额定电压的200%。本文还讨论了针对这种现象的对策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号