首页> 外文会议> >Total re-vamp of Cimento Tupi's clinker production line at the Pedra do Sino plant
【24h】

Total re-vamp of Cimento Tupi's clinker production line at the Pedra do Sino plant

机译:Pedra do Sino工厂的Cimento Tupi熟料生产线的总翻新

获取原文

摘要

The paper describes the original 1600 t/day plant as built in 1976, its modification in 1981, and the complete re-vamping and modernization project in 1992-1993, including five years of operating results and experience since then. It reports why the original preheater was replaced, the second branch modified, the precalciner added, the kiln shell replaced and the cooler re-designed. It further explains how this entire project was arranged for the kiln shut-down time of only 85 days.
机译:本文介绍了最初的1600吨/天的工厂,该工厂建于1976年,1981年对其进行了改造,并于1992-1993年完成了完整的改造和现代化项目,包括自那时以来的五年运营成果和经验。它报告了为什么要更换原始的预热器,修改第二个分支,添加预分解器,更换窑炉壳体以及重新设计冷却器的原因。它进一步解释了整个项目是如何安排的仅85天的窑炉关闭时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号