首页> 外文会议> >Transmission grid refurbishment project on the Zimbabwe Electricity Supply Authority (ZESA) high voltage power network
【24h】

Transmission grid refurbishment project on the Zimbabwe Electricity Supply Authority (ZESA) high voltage power network

机译:津巴布韦供电局(ZESA)高压电网的输电电网翻新项目

获取原文

摘要

Transmission grid refurbishment is not an easy thing to do considering the fact that the exercise does not result in an increase in revenue since the same power flows through the refurbished equipment as through the old system. The traditional methods of justifying the project on return on investment basis are therefore not easy to apply in motivating for transmission grid refurbishment. This paper presents an alternative method based on lifetime assessment and attempts to answer the question on how long should electric utilities sweat their assets before embarking on asset replacement. The method was successfully applied on the Zimbabwean ZESA transmission grid resulting in a phased approach to the refurbishment exercise.
机译:考虑到由于通过翻新设备的电力流与通过旧系统的电力相同,该练习不会导致收入增加,因此对输电网进行翻新并不是一件容易的事。因此,以投资回报为基础来证明项目合理性的传统方法不容易应用于激励输电电网的整修。本文提出了一种基于寿命评估的替代方法,并试图回答有关电力公司在着手进行资产置换之前应多长时间消耗其资产的问题。该方法已成功应用于津巴布韦ZESA输电电网,从而分阶段进行了翻新工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号