首页> 外文会议> >Fabrication of HIPped first wall panel for fusion experimental reactor and preliminary analyses for its thermo-mechanical test
【24h】

Fabrication of HIPped first wall panel for fusion experimental reactor and preliminary analyses for its thermo-mechanical test

机译:用于聚变实验堆的HIPped第一壁板的制备及其热机械试验的初步分析

获取原文

摘要

1-m-scaled and 400-mm-scaled first wall panels equipped with cooling channels were fabricated by Hot Isostatic Pressing (HIP) bonding. The first wall panels fabricated are composed of Al/sub 2/O/sub 3/ dispersion strengthened copper alloy and type 316 austenitic stainless steel. With the fabricated panels, thermo-mechanical tests are to be conducted. The results of the trial fabrication and the preliminary analyses for their thermo-mechanical tests are summarized in this paper.
机译:通过热等静压(HIP)粘合制造了尺寸为1m且尺寸为400mm的带有冷却通道的第一块墙板。所制造的第一块墙板由Al / sub 2 / O / sub 3 /弥散强化铜合金和316型奥氏体不锈钢组成。对于人造板,要进行热机械测试。本文总结了试制的结果及其热力学测试的初步分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号