首页> 外文会议> >Testing the subscriber interface to the ARINC 629 current mode bus
【24h】

Testing the subscriber interface to the ARINC 629 current mode bus

机译:测试ARINC 629电流模式总线的用户接口

获取原文

摘要

The use of the ARINC 629 Bus on the Boeing 777 airplane introduces new capabilities and new testing challenges. Complete testing of an LRU interface to the 629 Bus requires a sophisticated test approach to validate the redundancy and error checking incorporated in the Terminal Controller, SIM and Current-Mode-Coupler bus interface components. This paper describes basic 629 Bus operation and the redundancy and error checking incorporated in the 629 Bus interface components. The implications this carries for thorough testing lead to a discussion of the test resources required to perform this testing. A coupler module test resource is described that supports 629 stub waveform monitoring, attenuating and stress testing.
机译:在波音777飞机上使用ARINC 629总线带来了新的功能和新的测试挑战。完整测试629总线的LRU接口需要复杂的测试方法,以验证终端控制器,SIM和Current-Mode-Coupler总线接口组件中包含的冗余和错误检查。本文介绍了629总线的基本操作以及629总线接口组件中包含的冗余和错误检查。这对全面测试的影响导致对执行此测试所需的测试资源的讨论。描述了一个耦合器模块测试资源,该资源支持629 stub波形监视,衰减和压力测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号