首页> 外文会议> >UPS response to power disturbances-a proposed method for determination of UPS response to power disturbances
【24h】

UPS response to power disturbances-a proposed method for determination of UPS response to power disturbances

机译:UPS对电源干扰的响应-一种确定UPS对电源干扰的响应的建议方法

获取原文

摘要

The time it takes for a backup power system (BPS) to transfer to battery power (i.e. "transfer time") is difficult to measure. No industry standard exists describing a reasonable test for this measurement. A technique for inducing power interruptions and then measuring BPS output voltage response is described. Power interruptions at reduced voltage are recommended because data analysis from a North American Power Quality Study by National Power Laboratory show that 81 percent of all interruptions occur during a low voltage condition. Examples of the proposed measurement technique are shown for a variety of BPS topologies. Experimental results illustrate the difference between uninterruptible and standby power systems.
机译:备用电源系统(BPS)转换为电池电源所花费的时间(即“传输时间”)很难测量。不存在描述该测量合理测试的行业标准。描述了一种引起电源中断然后测量BPS输出电压响应的技术。建议使用降低电压的电源中断,因为国家电力实验室进行的北美电源质量研究的数据分析显示,所有中断的81%发生在低压条件下。针对各种BPS拓扑显示了建议的测量技术的示例。实验结果说明了不间断电源和备用电源系统之间的区别。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号