首页> 外文会议> >Performance testing of relays for intersystem faults in combined 380 kV/110 kV lines
【24h】

Performance testing of relays for intersystem faults in combined 380 kV/110 kV lines

机译:380 kV / 110 kV组合线路中系统间故障的继电器性能测试

获取原文

摘要

The Dutch Electricity Generating Board (NV SEP) is planning an extension of the Dutch 380 kV network. As a result of the limited number of right of way the new overhead high voltage lines will be combined with existing high voltage circuits on new towers. However this will increase the risk of intersystem faults. The authors describe how, in order to avoid excessive damage and unacceptable long outage times the present protection concept will be adapted to handle inter-system faults correctly.
机译:荷兰发电局(NV SEP)计划扩展荷兰380 kV网络。由于有限的通行权,新的架空高压线将与新塔架上的现有高压电路合并。但是,这会增加系统间故障的风险。作者描述了如何为了避免过度损坏和不可接受的长停机时间,将如何使本保护概念适应于正确处理系统间故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号