首页> 外文会议> >The application of dynamic programming theory for optimization of transmission line tower spotting
【24h】

The application of dynamic programming theory for optimization of transmission line tower spotting

机译:动态规划理论在输电线路铁塔定位优化中的应用

获取原文

摘要

The quality of tower siting of a transmission line determines directly the cost of the power line. Until now, all tower siting has been done by hand. It is impossible for a designer to choose a best plan from thousands of plans in practical work. In recent years, some of the problems described have had the possibility of being solved by the development of computation methods and the rapid progress of computers. Here, the authors describe how dynamic programming is the best way to solve the above problem.
机译:输电线路铁塔选址的质量直接决定了电力线的成本。到目前为止,所有塔选址都是手工完成的。在实际工作中,设计师不可能从数千个计划中选择最佳计划。近年来,所描述的一些问题有可能通过计算方法的发展和计算机的飞速发展而得到解决。在这里,作者描述了动态编程是解决上述问题的最佳方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号