首页> 外文会议> >Human factors assessment of digital monitoring systems for nuclear power plants control room
【24h】

Human factors assessment of digital monitoring systems for nuclear power plants control room

机译:核电厂控制室数字监控系统的人为因素评估

获取原文

摘要

A human factor analysis is developed for a digital (digital-bar graph) display for nuclear power plant control rooms. The new instrumentation would replace existing conventional analog monitoring systems. The analysis on a dual digital-bar graph unit addressed and resolved certain human engineering deficiencies (HEDs) discussed here. The success that control room operators will have by monitoring this instrumentation is related to how well designers and human factors specialist enhance this instrumentation, so that it presents information in an efficient manner and with no information overload to operators.
机译:针对核电厂控制室的数字(数字条形图)显示开发了人为因素分析。新仪器将取代现有的常规模拟监视系统。对双数字条形图单元的分析解决并解决了此处讨论的某些人为工程缺陷(HED)。控制室操作员通过监视该仪器而获得的成功与设计人员和人为因素专家对该仪器的增强程度有关,因此它可以有效地向操作人员提供信息,而不会给操作员带来过多信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号