首页> 外文会议> >East Coast Main Line: electrification fixed equipment maintenance
【24h】

East Coast Main Line: electrification fixed equipment maintenance

机译:东海岸干线:电气化固定设备维修

获取原文

摘要

The East Coast Main Line is the most recent and significant addition to the British Rail electrified network and has interconnections into other electrified lines along its route between London King's Cross and Edinburgh. The line is in the process of being electrified, the completed part of the route being London to York and the Leeds branch. The electrification system is standard BR 25 kV single phase overhead. Incoming supplies are taken from the national grid network at 16 locations. The author looks at maintenance of the power supply, the overhead equipment, safety and performance management of the electrification equipment.
机译:东海岸干线是英国铁路电气化网络的最新且重要的补充,并且在伦敦国王十字路口和爱丁堡之间的线路上与其他电气化线路互连。该线路正在电气化过程中,路线的完成部分是伦敦至约克和利兹分公司。电气化系统为标准BR 25 kV单相架空。进货来自16个地点的国家电网。作者研究电源的维护,高架设备,电气化设备的安全性和性能管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号