PACS: moving a live PACS with zero downtime

机译:PACS:以零停机时间移动实时PACS

获取原文
获取原文并翻译 | 示例

摘要

Abstract: As PACS implementations increase during the new millennium, the need to plan and execute the movement of a live PACS from an existing facility into a replacement hospital increases. Such an undertaking should support not only the physical movement of the existing PACS but also the continuous support of clinical radiology operations throughout the transition period. This paper will describe two successful transitions of live PACS into newly constructed replacement hospitals. In 1994 the Brooke Army Medical Center transitioned into a newly constructed 450-bed facility in San Antonio Texas. In 1999 a similar movement of the Elmendorf Air Force Medical Center was successful accomplished in Anchorage Alaska. Both moves provided continuous operations of the Radiology Department and full clinical services in the old facilities in a near filmless mode while fully supporting the simultaneous installation and testing of new PACS components and PACS-to- modality interfaces in the new facilities. The process also included the migration of the image archives and acceptance testing of the final installation. While the exact migration process must differ, depending on the PACS architecture and the facility transition plans, these two examples provide a general framework for the issues and strategies for such a move. !5
机译:摘要:随着新世纪PACS实施的增加,计划和执行将实时PACS从现有设施转移到替代医院的需求也越来越大。这项工作不仅应支持现有PACS的物理移动,而且还应在整个过渡期间持续支持临床放射学操作。本文将介绍两种成功的将实时PACS过渡到新建的替代医院的方法。 1994年,布鲁克陆军医疗中心过渡到德克萨斯州圣安东尼奥市新建的450个床位的设施。 1999年,类似的Elmendorf空军医疗中心运动在阿拉斯加安克雷奇市成功完成。两项举措均以近乎无胶片的方式在旧设施中提供了放射科的连续运作和全面的临床服务,同时完全支持在新设施中同时安装和测试新的PACS组件以及PACS到模态界面。该过程还包括映像档案的迁移和最终安装的验收测试。虽然确切的迁移过程必须有所不同,但取决于PACS架构和设施转换计划,这两个示例为此类移动的问题和策略提供了通用框架。 !5

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号