首页> 外文会议>Lead-Zinc 2000 Symposium , Oct 22-25, 2000, Pittsburgh, U.S.A. >OPERATIONS AT THE DOE RUN COMPANY'S HERCULANEUM PRIMARY LEAD SMELTER
【24h】

OPERATIONS AT THE DOE RUN COMPANY'S HERCULANEUM PRIMARY LEAD SMELTER

机译:DOE RUN公司的HERUCULANEUM主要铅冶炼厂的运营

获取原文
获取原文并翻译 | 示例

摘要

The Doe Run Company's Herculaneum, Missouri lead smelter has existed in continuous operation since 1892. Throughout the history of the plant extensive developments have been made to improve throughput, increase productivity, decrease operational costs and improve technology, while remaining an environmentally responsible producer of high quality primary lead in the international market. This paper provides an overview of the Herculaneum smelter, focusing on the most recent configuration of the operations. The paper includes discussion on all the aspects of primary lead production at the Herculaneum smelter.
机译:Doe Run公司位于密苏里州Herculaneum的铅冶炼厂自1892年以来一直连续运行。在工厂的整个历史中,为提高产量,提高生产率,降低运营成本和改进技术进行了广泛的发展,同时保持了对环境负责任的高炉生产商在国际市场上质量领先。本文概述了赫库兰尼姆(Herculaneum)冶炼厂,重点介绍了最新的操作配置。该文件包括有关Herculaneum冶炼厂主要铅生产所有方面的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号